IEC 60255-151 / IEC 602698 min read

Fuse–Relay Grading: Setting an IDMT Relay Above a 200 A gG Fuse

Part 2 of the protection series. The margin over a fuse grows with the fuse time (0.4 t + 0.15 s). The steep part of the fuse curve at low current sets the relay TMS.

Scenario

Downstream200 A gG fuse on an outgoing feeder
Fuse total clearing times (manufacturer's curve, values for this example)1.5 s at 1.5 kA; 0.25 s at 2 kA; 0.02 s at 4 kA; 0.01 s at 15 kA (maximum fault)
Upstream relayIEC Standard Inverse, pickup 1,000 A
Margin rulet_relay ≥ t_fuse + (0.4 t_fuse + 0.15 s)

Step-by-step calculation

Step 1: Required relay times

CurrentFuse (s)Required relay (s)
1.5 kA1.502.25
2 kA0.250.50
4 kA0.020.178
15 kA0.010.164

Step 2: TMS needed at each point

TMS = t_required / t(TMS = 1)
1.5 kA: 2.25/17.19 = 0.131; 2 kA: 0.50/10.03 = 0.050; 4 kA: 0.178/4.98 = 0.036; 15 kA: 0.164/2.52 = 0.065
Governing TMS = 0.131 (at 1.5 kA) → select 0.14

Step 3: Relay times with TMS 0.14

Step 4: Why not an Extremely Inverse curve here?

EI would need only TMS 0.035 at 1.5 kA, but at 15 kA its time falls so fast that TMS 0.46 is needed to keep 0.164 s. With these fuse data SI gives the better overall result; with other fuses EI often wins. Check the whole range either way.

Result summary

CheckRequirementActualStatus
Margin at 1.5 kA≥ 2.25 s2.41 s✓ PASS
Margin at 15 kA≥ 0.164 s0.35 s✓ PASS
With the relay at pickup 1,000 A and TMS 0.14 (IEC SI), it grades with the 200 A gG fuse at every current from 1.5 kA to the 15 kA maximum. The low-current end of the fuse curve sets the TMS.

Key insight: Fuses have no fixed margin: the relay must allow for fuse tolerance, which grows with the fuse operating time. Use the manufacturer's total-clearing curve, not the pre-arcing curve.

Try it with your own numbers

Every input in this example is editable in the live calculator — no signup needed.

Open IDMT Relay Coordination calculator →

Frequently asked questions

Where does 0.4 t + 0.15 s come from?

It is a commonly used rule for an upstream relay over a downstream fuse: 0.4 t covers fuse tolerance and 0.15 s covers relay overshoot and breaker time.

What about a fuse upstream of a relay?

Then the fuse must not melt before the relay and breaker clear, so compare the fuse's minimum pre-arcing curve with relay time plus breaker time, with margin.