IDMT Relay Coordination Calculator

Enter settings for up to 8 relays (downstream to source) to compute trip times and check grading margin across the full fault-current range. Curves per IEC 60255-151 and IEEE C37.112.

AAJappsEngineering Calculation Report

IDMT Relay Coordination Calculator

IEC 60255-151 / IEEE C37.112

Generated

For preliminary engineering use only — always verify results against project-specific standards and a qualified engineer's review before use in a real design.

Relay 1 (Downstream)

Relay 2 (Upstream)

2 of 8 relays

Time-current characteristic (TCC)

Results

Relay 1 (Downstream) trip time
0.227 s
at 2,000 A
Relay 2 (Upstream) trip time
0.658 s
at 2,000 A
Required grading margin (CTI)
0.4 s typical for electromechanical relays, 0.3 s for numerical/digital
Relay 1 (Downstream) → Relay 2 (Upstream) margin at 2,000 A
+0.432 s

Full-range chain coordination check

Grading margin swept across the entire fault current range shown on the graph for every successive relay pair, not just the single point above.

Relay 1 (Downstream) → Relay 2 (Upstream)
Minimum margin 0.254 s at 10,000 A
FAIL