Preliminary CHP electrical capacity from a site's electrical and thermal baseloads, sized to the more limiting of the two so neither output goes to waste.
Baseload-matching CHP sizing practice — size to the smaller of the electrical- and thermal-derived capacities
Generated
For preliminary engineering use only — always verify results against project-specific standards and a qualified engineer's review before use in a real design.